Stacy Witbeck https://stacywitbeck.com/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This $9.4 million CM/GC project was for constructing an accessible pedestrian and cyclist crossing over the Union Pacific freight and TriMet light rail tracks between SE 14th Avenue and SE 13th Place in Portland. The project included erecting a 142 ft long, 100-ton structural steel span across three sets of light rail tracks and two sets of freight tracks, four steel towers, two stairways, and two elevators. 

This crossing restored the connection in SE Portland's Hosford-Abernethy neighborhood, which was eliminated due to the construction of the TriMet Orange Line MAX tracks.

Quick Facts

Location

Portland, OR

Project Type

Bridges and Highways

Delivery Method

CM/GC

Date Completed

2019

Project Owner

Tri-County Metropolitan Transportation District of Oregon (TriMet)

Region

Northwest

/

"I want to take this opportunity to thank Stacy Witbeck for providing excellent service and commitment to not only the Gideon project but also for maintaining great relationships with the businesses and community."

Project Manager, TriMet