This project includes constructing a higher-speed rail system from West Palm Beach to the Orlando International Airport. As part of a joint venture, our team was the prime contractor for Zone 4, which runs from West Palm Beach to Cocoa. Zone 4 includes 130 miles of new track construction and track rehabilitation, relocation of a fiber optic system, a new signal system, crossing signal protection, and 28 bridges.
West Palm Beach to Cocoa, FL
Commuter Rail, Bridges and Highways
Best Value
2023
Brightline
Modern Railway Systems
East
"The CPUC and the FTA referred to the Mid-Coast project from design to construction and operations, as a new standard for the industry in a number of categories."
Chief Operating Officer, San Diego MTS