Stacy Witbeck https://stacywitbeck.com/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

These two projects, valued at $46 million, were to construct Salt Lake City’s first modern streetcar line. The two-mile system, known as the S-Line, connects UTA’s light rail system with the Sugar House business district. The initial project was built in an abandoned railroad corridor, while the second project double-tracked portions of the original line. 

The system crosses 12 roadways and includes eight stations, train and traffic signals, an overhead catenary system, and traction power substation infrastructure. The scope included the construction of a greenway along the alignment, which forms a linear park with plazas, bike and hiking trails, landscaping, and public art to enhance the pedestrian-friendly feel of the corridor. The project team received numerous letters of appreciation from local businesses and stakeholders. 

Project Awards:

ENR Best Projects – Award of Merit Airport/Transit 

AGC of Utah Transportation Project of the Year

International Partnering Institute John L. Martin Partnered Project of the Year, Diamond Level

Quick Facts

Location

Salt Lake City, UT

Project Type

Streetcar, Parks & Public Spaces

Delivery Method

CM/GC, Design-Build

Date Completed

2019

Project Owner

Utah Transit Authority

Subsidiary Involvement

Modern Railway Systems

Region

Mountain

/

"We appreciate the time and resources Stacy Witbeck provided to ensure the projects were constructed in a successful manner.  Their expertise in finding innovative ways and approaches to meet challenging time restrictions is outstanding."

P.E., Utah Department of Transportation